山东冷库安装应该陆续放货

大家会看到很多山东冷库安装的步骤及注意事项,本站也有专业的介绍,今天我们来讲一下冷库安装后,你该做些什么呢?

You will see a lot of cold storage installation steps and matters needing attention in shandong, the site also has a professional introduction, today we talk about the cold storage after installation, what should you do?

Shandong cold storage installation

首先,冷库接通电源。然后,显示灯显示后,控制箱内压缩机及冷风机优先调为自动或手动。延迟三分钟,压缩机开始运转,电控箱外部压缩机指示灯亮。再延迟三分钟,冷风机开始运转,电控箱外部指示灯亮。这些都做好了,你会看到显示器进入调节状态(见显示器操作步骤)。

First of all, cold storage processing power. Then, after the display lamp, control of the compressor and cooling fan in the cabinet is preferred to automatically or manually. Delay for three minutes, started compressor operation, external electric compressor indicator. To run again delayed for three minutes, cooling fan, electric cabinet external indicator. These are ready, you will see the display into the modulatory state (see display operation steps).

当一切进入正常状态时,控制箱上的综合保护器运行灯亮(绿色);当断项(线路问题)时,红灯亮,当过载(额定电流和电压过大)时,黄灯量,出现以上问题时,同时会发生滴滴滴的报警声。

When everything into the normal state, the integrated protector on the control box to run the light (green); When broken items (lines), red light, when overload (rated current and voltage is too large), yellow light, the above problems, drops drip alarm will happen at the same time.

冷库正常开启后,将库内温度降到最低温度,然后再放入货物。山东冷库安装首次放货,应陆续放货,每次放货量应小于库容积的60% 。

Cold storage after normal open, minimize temperature inside temperature, and add the goods. Shandong cold storage installation for the first time put goods, should gradually release cargo, each put cargo storage capacity should be less than 60% of the product.